Intermediate - Drill Bit 17"
Sunday 25 October 2020

Drilling 17" hole from 0m to 650m
Tuesday 27 October 2020

Circulate HiVis pill. Significant increase in cuttings noted at shakers.
Tight hole sections due to formation instability
Tripped out for running casing
Pump slug & POOH wiper trip back to Drill collars strapped out, and Run back in tagged up on brige at 650m,
Wednesday 28 October 2020

Equipment needs to be repaired
Wash down & circ csg
Cemented casing,returns to surface,bumped plug with 1500psi, held good
Installed the BOP
Thursday 29 October 2020

Function tested the BOP
RIH and tag top plug at 642m (correct tag depth).
Circ and cond mud to even wt 8.4ppg